#256792 29.04.2009 07:45:17
May 2009 AO-51 Schedule
Due to rapidly increasing eclipse lengths throughout May, we need to keep the satellite in "normal" mode for Whole Orbit Data (WOD) collection via the BBS. Power output will steadily be decreased throughout the month.
April 27 - May 31
FM Repeater, V/U
Uplink: 145.920 MHz FM
Downlink: 435.300 MHz FM
9k6 BBS and Telemetry
Uplink: 1268.700 MHz FM
Downlink: 435.150 MHz FM
73, Drew KO4MA
AMSAT-NA VP Operations
źródło http://www.amsat.org/amsat-new/echo/CTNews.php
Due to rapidly increasing eclipse lengths throughout May, we need to keep the satellite in "normal" mode for Whole Orbit Data (WOD) collection via the BBS. Power output will steadily be decreased throughout the month.
April 27 - May 31
FM Repeater, V/U
Uplink: 145.920 MHz FM
Downlink: 435.300 MHz FM
9k6 BBS and Telemetry
Uplink: 1268.700 MHz FM
Downlink: 435.150 MHz FM
73, Drew KO4MA
AMSAT-NA VP Operations
źródło http://www.amsat.org/amsat-new/echo/CTNews.php
TRX: YAESU FT 847, YAESU FT-7800, YAESU VX-3, ICOM IC-W31E
ANT
IPOL MULTIBAND ,X-510 N 144-146/430-440 MHz
ANT